Geisinger Janet Weis Children’s Hospital
Location:
Danville, Montour County, Pa
Zartman Construction installed a Photovoltaic Suniva solar system on the roof the Children’s Hospital.
There are one hundred forty-four 270 watt solar panels, which equate to 38,800 in total panel wattage.
The 144 Enphase M250 micro-inverters (208V 3 phase) with the Envoyer Communication Gateway include individual panel production monitoring.
The panels produce about 20 percent of the hospital’s peak energy load.
The project won the Governor’s Award for Environmental Excellence in 2016.